The Snohomish Theatre took on a new face and a new floor. Our project
was to create a level surface for carpet and tile. This required multiple
lifts of gypsum concrete of varying depths ranging from 6" feathering to 0" with
the use of rigid insulation. The existing floor had many surfaces and elevations
to cover including wood, tile and concrete. Our setup site was limited to
a small alley. Below left
is the floor prior to gypsum concrete. Below right is the same
floor after gypsum concrete was poured.
Click here for more
applications
![]() |
![]() |